Client RD Hughes Development

Completed June 2017

Location Christchurch

Scope & Scale

Hughes Development on behalf of Lanocorp, put together a design and build development and selected HRS as part of the team on an ECI and negotiated GMP contract.

The new 2,834m2 build sits on an 8,000m2 site and provides temperature-controlled process and packing space for manufacture of products, inward/raw and outward /finished product storage, office space (395m2) for management and administration and covered (312m2) and uncovered shipping container handling areas.

Construction involved installation of building services suitable to manufacturing including supply of large volumes of very hot water, treatment of dirty wastewater, temporary control in process and packaging areas, special fire rating between manufacturing floor and first floor office.

Design and detail allow for the roof to defect under wind and snow loadings, without causing damage to the fire walls

Performance

HRS delivered a purpose-built facility that assists Lanocorp in its product growth, research and development and operational efficiencies.  The development was on a greenfield site that also required HRS to manage large site works and drainage component – achieved without any environmental incidents. 

All concrete and carpentry work was undertaken by HRS resource.

The physical works progressed without issue and completion was achieved on time inclusive of additional scope required by Lanocorp.

Programme: Achieved

Health & Safety: No lost time injuries or significant H&S issues experienced.

Budget: Achieved